Come rain, snow or shine, The Bannett Group goes the extra mile to keep a project on schedule. When blistering cold threatened to shut down the construction of a Chick-fil-A restaurant in Cherry Hill, a tent was erected to protect the job from the elements. That tent was still in place when rain arrived just in time to pour the slab. Luckily, no time was lost and the slab was poured successfully.