Skip to main content
The Bannett GroupThe Bannett GroupThe Bannett Group
search
Menu
  • About
    • Our People
    • Our Process
    • Resources
  • What We Do
    • Professional Services
    • Project Types
    • Renovations
  • Our Work
    • Portfolio
      • Commercial & Office
      • Health Services
      • Industrial
      • Religious
      • Restaurants
      • Retail
    • Geography
    • Under Construction
  • Blog
  • Contact
  • search
  • Menu
Close Search

BLUSA Defense Manufacturing Office and Warehouse Renovation

warehouse renovation
View Larger
warehouse renovation
View Larger
warehouse renovation
View Larger
warehouse renovation
View Larger
warehouse renovation
View Larger
warehouse renovation
View Larger
warehouse renovation
View Larger
warehouse renovation
View Larger
warehouse renovation
View Larger
warehouse renovation
View Larger
warehouse renovation
View Larger

BLUSA Defense Manufacturing Relocated

When mechanical and electro-mechanical fabrication company BLUSA Defense Manufacturing recently began the process of relocating their corporate headquarters they reached out to TBG to assist them in finding an existing building perfect for an office and warehouse renovation the fit their growing needs. Working with our architectural team we first helped review potential locations to verify they would meet their requirements once renovated. Following the site review, TBG then designed a new space with the goal of consolidating the client’s multiple warehouses, manufacturing and office locations all under one roof.

The result is a streamlined facility housing a 50,900 square foot first floor manufacturing and warehouse area, along with over 16,000 square feet of office space on the second floor. Highlights of the warehouse renovation include a new manufacturing production floor with both manual and CNC machining, electronics and quality assurance labs, an in-house paint shop and inventory storage.  

In addition to the transformation of the first floor, the second floor office area features a large daylit open employee workspace, as well as various executive offices and multiple conference rooms, the largest of which looks out onto the manufacturing floor. The project also included the addition of an elevator allowing access to the second floor, a large employee breakroom and even a health and wellness gym space.

Rounding out the project, BLUSA used this opportunity to upgrade the entire building to be more energy efficient, in addition to reducing operating costs. Solar panels, energy efficient glazing on exterior windows, new HVAC equipment and installation of LED lighting was all done in a shift toward sustainability.  

Mt. Laurel, NJ

visit BLUSA Defense Manufacturing

  • Architecture
  • Construction
  • Design Build
  • Interior
  • Project Management
Share Tweet Share Pin
12 Ways to Lower Construction Costs Get the White Paper

ADDRESS:

The Bannett Group, Ltd.
1998 Springdale Road, Suite 101
Cherry Hill, NJ 08003

Voice & Email

p. 856.751.8800
f. 856.751.7692
e. info@thebannettgroup.com

Tags

Architecture Bannett Group Buzz Commercial Construction Construction Demolition Design Build Facade Industry News Interior Project Management Retail Ribbon Cuttings Sitework Under Construction

LINKS

  • Get Info
  • Careers
  • Vendors
  • Subscribe
Close Menu
  • About
    • Our People
    • Our Process
    • Resources
  • What We Do
    • Professional Services
    • Project Types
    • Renovations
  • Our Work
    • Portfolio
      • Commercial & Office
      • Health Services
      • Industrial
      • Religious
      • Restaurants
      • Retail
    • Geography
    • Under Construction
  • Blog
  • Contact

Get Info
Careers
Bid List
Subscribe

GIVE US A CALL: 856.751.8800